Charter & Issues
How embedded project charters and spatially-anchored issues provide decision traceability, clarity, and geometry-bound intent in .duc.
Overview
In traditional engineering workflows, project intent, design requirements, and issue discussions live in external software decoupled from the CAD models and drawing canvas. When a design choice is made, the reasoning behind it is quickly lost, leaving future contributors and automated tools unable to understand why the project state exists.
.duc solves this by embedding both the Project Charter and Spatial Issues directly inside the SQLite database container.
Core Philosophy: Less Noise, More Clarity
Both the Charter and Issues systems are designed around a single guiding principle: doing more with less.
Enterprise management tools often introduce bloated status dropdowns, heavy process overhead, and administrative clutter. In contrast, .duc packs project intent and issue tracking into compact, lightweight data structures:
- Minimal Status Sets: Rather than complex state machines, Charters cycle through four non-linear phases (
intent,review,delivery,closed), and Issues use three simple statuses (open,closed,dismissed). - Signal Over Noise: By eliminating unnecessary metadata clutter, engineering teams gain immediate clarity on project objectives, hard constraints, and open design questions.
The Project Charter: Reasoning Anchor
Grounded in ISO 21500/21502 project management standards, the Project Charter serves as the identity and reasoning anchor for the entire document.
Every requirement, constraint, and decision in a .duc file traces back to the Charter’s core fields:
1. Requirements & Acceptance Criteria (DucCharterRequirement)
Requirements define what the delivered outcome must do or be, not how to build it or what work is in scope:
must: true: Non-negotiable requirements. Failure to satisfy this requirement fails the project.must: false: Strong preferences that do not block project execution if unmet.acceptanceCriteria: Concrete, testable statements that define verifiable completion.
2. Solution Constraints (DucCharterConstraint)
Constraints define limiting conditions that bound the allowable solution space, including technical limits, regulatory bounds, and explicit scope exclusions:
hard: true: Non-negotiable boundaries that cannot be violated under any circumstance.hard: false: Soft preferences that can be revisited with documented justification.
3. Decision Log (DucCharterDecision)
A Charter Decision records a resolved choice significant enough to explain the current design direction:
accepted: true: Choice is actively in effect.accepted: false: Choice was considered and explicitly rejected (kept for historical traceability so teams don’t re-debate discarded options).rationale: Stated reasoning, alternatives considered, and accepted consequences.issueIds: Traceable links to the issue threads that informed the decision.
Issues & The Carrot Methodology
While the Charter holds resolved project direction, Issues hold open questions, feedback, technical concerns, and the discussion thread that resolves them.
The Carrot Methodology: Tying Discussion to Geometry
Under the Carrot methodology, issue tracking is stripped of administrative overhead and anchored directly onto the physical project geometry using DucIssueAnchor:
- Canvas Anchoring (
type: "canvas"): Pins an issue to an exact 2D coordinate(x, y)and measurement unitscopeon the drawing surface. - Element Anchoring (
type: "element"): Attaches an issue directly to a specific 2D element ID and local element anchor point(anchorX, anchorY). - 3D Model Anchoring (
type: "model"): Pins an issue to a 3D CAD/BREP model element, storing:point: 3D coordinates in the model’s native units.normal: Surface normal vector to orient visual markers away from geometry.viewerState: Saved camera inspection angle, zoom, and orientation so reviewers see the exact view context where the issue was raised.topologyId: Stable CAD/BREP/IFC topology identifier for persistent geometric tracking.
🥕 Why the name “Carrot”? While designing issue status badges in Scopture, we assigned orange to
open, green toclosed, and greenish-grey todismissed. We accidentally realized the color palette matched a carrot and placing an uncollected issue pin on the canvas felt just like a carrot planted in the soil waiting to be harvested.
Decision Traceability Across the Canvas
The integration of Charter and Issues creates complete decision traceability:
- An engineer or reviewer identifies a problem directly on the drawing canvas or 3D model and opens a Spatial Issue.
- Team members discuss options within the issue message thread (
messages). - When consensus is reached, the issue resolves into an accepted or rejected Charter Decision, linking the issue ID for full historical context.
Without Charter and Issues embedded directly inside .duc, project development becomes decoupled from the canvas, decision traceability breaks down, and the physical CAD model loses its reasoning anchor.